At 1015 East Hastings beside the Hastings viaduct we combined permanent underpinning and anchored shoring to protect the bridge while building a three level parkade. On Glen Drive, difficult excavation near dense utilities was managed with cantilever pipe piles, deadman tieback anchors and blocks, staged to control street surcharge. We led contaminated site ESC design and monitoring with the environmental engineer, completed hydrogeotechnical seepage analysis to estimate dewatering and size treatment, and prepared the provincial water use permit. Movement thresholds were set at 5 mm for bridge closure so design, sequencing, and rigorous anchor testing were tailored to prevent movement, and recorded movement was about 1 mm.
Read MoreAt 1577 Lloyd Avenue we used preloading with settlement monitoring to pre-compress organic soils, then designed a raft-slab foundation to meet seismic and serviceability goals. Groundwater trends and the 6.8 m FCL informed grading and finished floor elevation, helping deliver a flood-aware, buildable solution.
Read MoreIpsum est occaecati aliquam delectus odio officia qui explicabo aut. Et qui repellendus quam sapiente et aliquam dolorem sint. Debitis nulla voluptatem molestiae qui numquam. Seq
Read MoreAt Imperial Street in Burnaby we are supporting a 30 storey high rise with a four level parkade. A sonic drilling program to about 50 feet and MASW established site specific Vs30 for seismic design. One side required non encroaching shoring, so we used internal rakers and walers to keep all support inside the property line. Groundwater is managed with weepholes, sumps, and pumping to protect the prepared foundation subgrade, and conventional foundations on very dense native soils are released at the bottom of excavation once bearing is verified at the design subgrade elevation.
Read MoreSlope stability analysis, geogrid-reinforced tiered retaining walls, and construction reviews for a turf playfield and field house in North Vancouver, including WCB slope safety checks, subgrade approvals, geogrid verification, and density testing to confirm compaction.
Read MoreTanked basement with a raft slab to isolate contaminated groundwater, anchor shoring with localized underpinning near property lines, and an ESC plan with treatment and metered discharge, all coordinated through staged excavation, anchor testing, and field monitoring on Powell Street.
Read MoreMulti-phase geotechnical program for the Winskill Aquatic Centre in Delta, including site-specific Vs30, pool foundations on dense Vashon drift, tie-down anchors at brace bays, and staged excavation with light-pole protection and subgrade approvals at the bottom of excavation.